関西化工 Official site

[Construction Example] FRP Loose Lining Work

This is an example of repair by installing FRP panels on the inside of deteriorated concrete tanks.

Here is a case study of the "FRP Loose Lining Construction" that our company has carried out. In a certain food factory, there was a challenge of not being able to stop the inflow of water while the factory was in operation, and the work needed to be completed in a short period of time. Therefore, we fixed the FRP sheets to the concrete with anchor bolts while continuously discharging the inflow water. We lined the gaps between the sheets with FRP as a countermeasure. 【Case Study】 ■ Production Days: Approximately 15 days ■ Type of Work: Lining ■ Work Days: 13 days ■ Date/Location: May 2016/Saitama Prefecture ■ Equipment Used: FRP Sheets/FRP Lining *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://kansaikako.co.jp/

basic information

【Related Products】 ■Concrete Diagnosis ■Epoxy Lining ■PVC Lining ■Rubber Lining *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Construction Example] FRP Loose Lining Work

TECHNICAL

Distributors

Recommended products