関西化工 Official site

[Construction Case] Certain Housing Complex - Trench and Center Well Replacement Work

This is a case study of the replacement work of an aging iron overflow weir with a new resin one.

We would like to introduce a case of replacing an aging iron overflow weir in a certain housing complex with a new resin one. The existing overflow weir at the site was at risk of falling due to aging, necessitating prompt restoration. After a site survey, we manufactured an overflow weir of the same size using PVC and carried out replacement work including surrounding equipment. 【Construction Case】 ■ Manufacturing Days: 14 days ■ Type of Work: Equipment Installation ■ Working Days: 2 days ■ Date/Location: June 2019/Shiga Prefecture ■ Equipment Used: Trench, Center Well *For more details, please refer to the PDF materials or feel free to contact us.

Related Link - http://kansaikako.co.jp/

basic information

【Related Products】 ■ Center Well ■ Measuring Tank ■ Scum Skimmer ■ Overflow Weir *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Construction Example] Certain Housing Complex - Trench and Center Well Replacement Work

TECHNICAL

Distributors

Recommended products