ケネスエネルギー開発 Official site

Reliable cost reduction with rooftop solar power generation at pharmaceutical factories! Up to 28% cut.

"A reliable solution for energy measures in pharmaceutical factories." With rooftop solar power generation, electricity costs can be reduced by up to 28%. It also strengthens BCP (Business Continuity Planning).

Clean rooms and temperature-controlled environments are essential for pharmaceutical manufacturing. We protect their stable operation by converting fixed costs through renewable energy. ■ Current Issues - Fluctuations in electricity prices directly impact manufacturing costs - Concerns about backup systems during power outages - Requests from clients for CO₂ reduction and ESG compliance ■ Changes After Implementation - Before: Market-linked variable electricity prices + issues with emergency power supply - After implementation: Self-consumption from rooftop solar, reducing electricity costs by up to 28% → Achieving BCP measures for pharmaceutical lines and CO₂ emission reductions *For more details, please download the catalog or feel free to contact us.

Reduction achievements in electricity usage from Kenneth-style solar power generation.

basic information

■ Feature 1: Self-consumption of renewable energy power compatible with clean manufacturing Can be introduced with zero initial costs through the PPA model, with immediate reduction effects after implementation ■ Feature 2: Can be linked with emergency storage batteries as a BCP measure Enables temperature control of pharmaceuticals and continuity of manufacturing equipment even during power outages ■ Feature 3: Complete support for subsidy and grant applications Up to 2/3 support for eligible expenses, including medical corporations

Price information

[Price, Subsidy, Delivery Time] Individual estimates based on roof shape and electricity usage (free) With the onsite PPA model, initial costs are 0 yen Subsidies can be utilized up to a maximum of 2/3 (Ministry of the Environment, Tokyo Metropolitan Government, etc.) Delivery time: As short as 2 months from investigation to installation completion

Delivery Time

Applications/Examples of results

【Applications and Case Studies】 ■ Applications Manufacturing lines (clean rooms, air conditioning) Reduction of power burden for management buildings and research facilities Ensuring chemical management during power outages with battery storage ■ Case Studies A major pharmaceutical factory: Annual electricity costs reduced from approximately 9.5 million yen to about 6.9 million yen Utilization of subsidies: Covers about 60% of installation costs Reduction of annual CO₂ emissions by approximately 65 tons, reflected in environmental reports

Related Videos

Introduction of a self-consumption solar power generation system.

TECHNICAL

[Achievements Introduction 2.0] Over 80 projects in the last 12 years with a total construction cost exceeding 900 billion yen! Solar power construction achievements!

COMPANY

Distributors

Recommended products