The first step in decarbonization management is a 28% cost reduction through industrial self-consumption solar power generation!
Electricity cost reduction × CO₂ reduction = The number one decarbonization solution with management impact. Introduction with zero initial cost is also possible.
The most straightforward and reliable GX (Green Transformation) measure is industrial self-consumption solar power generation. 【Why start with solar power generation?】 - Challenges of decarbonization management Pressure from clients and shareholders demanding reduced environmental impact Rising electricity costs are squeezing profits There are too many decarbonization measures, making it unclear "where to start" We propose solutions to the above challenges!
basic information
- Reasons why solar power generation is ideal for the "first step" - Guaranteed effectiveness - By simply installing it on factory or warehouse roofs, you can self-consume electricity during the day - Reduces both electricity costs and CO₂ emissions - Overwhelming sustainability - Solar energy is free and infinite, with effects lasting over 20 years - Zero additional costs and operational burden - Almost maintenance-free after installation - No need for human resources - Subsidies and zero initial costs for introduction - Up to 2/3 subsidy through the use of subsidies - Zero equipment costs with the PPA model
Price range
Delivery Time
Applications/Examples of results
■ Case Study: Osaka Prefecture Pharmaceutical Manufacturing Plant Installed Capacity: 200 kW Annual Electricity Cost Savings: Approximately 6,000,000 yen CO₂ Reduction Effect: Approximately 170 tons per year Effect: Achieved a renewable energy ratio of 30% in the decarbonization management report.
Related Videos
catalog(2)
Download All CatalogsNews about this product(2)
-

Don't leave corporate roofs, parking lots, and idle land as "costs": Utilizing self-consumption solar power to simultaneously reduce electricity costs and BCP risks.
The "fuel cost adjustment," which reflects fluctuations in fuel prices and exchange rates in electricity rates every month, hits management hard as it relies more on externally purchased electricity. Furthermore, in recent years, situations have arisen where demand and supply suddenly tighten due to overlapping factors such as extreme heat and equipment shutdowns, leading to warnings being issued. On the other hand, the roofs, parking lots, and unused land owned by companies are "sleeping assets" that only incur "maintenance costs for fixed assets" without generating profits. If left unaddressed, the risk of rising electricity costs and operational shutdowns during power outages will simultaneously increase, disrupting profit plans. The root cause is a single issue—an over-reliance on externally purchased electricity without utilizing idle assets. The solution is to create self-consumption solar power (plus storage batteries) to generate the necessary electricity on-site. For example, a system with a scale of 190.88 kW is expected to generate approximately 221,680 kWh annually, with an estimated reduction of about 96 tons of CO₂. We will transform idle assets into "investment assets for reducing electricity costs" through a seamless process from construction to subsidy application.
-

Osaka Prefecture × Hanwha Japan "Green Alliance" collaboration agreement project! Installing solar power generation systems in child welfare facilities and educational institutions within the prefecture.
On July 16, 2025, Osaka Prefecture and Hanwha Japan signed a partnership agreement under the SDGs partnership system "Green Alliance," marking the official launch of the installation of solar power generation systems in child welfare facilities and educational institutions within the prefecture. In this project, our company handles everything from design to construction in a unified system, achieving both rapid delivery and high quality. The facilities that adopt this system will consume approximately 120 MWh of renewable energy annually, significantly reducing electricity costs and enabling data provision for environmental education programs. [Background and Purpose of Implementation] Recently, the introduction of renewable energy in local governments is expected to play a role not only in reducing CO₂ emissions but also as an environmental education tool for the next generation. The "Green Alliance" promoted by Osaka Prefecture is a system that accelerates concrete efforts toward achieving the SDGs by fostering collaboration between businesses and government. In this partnership agreement, we aimed to combine the solar panels provided by Hanwha Japan with our construction know-how to implement the most suitable systems for child welfare and educational facilities in a short timeframe.
Distributors
Kenneth Energy Development Co., Ltd. is a company aiming to promote renewable energy, operating in the following three main areas: 〇 Energy development business centered on solar power generation - Comprehensive support from planning, design, construction, to operation of rooftop and ground-mounted solar power plants - Assistance with connection negotiations with power companies and various permit applications, ensuring a smooth introduction even for first-timers 〇 Electrical equipment construction business - Handling a wide variety of electrical work, including new construction and renovation of commercial facilities and apartments - Broad coverage of all equipment, including lighting, air conditioning, emergency power supply, water supply and drainage, and gas piping 〇 Real estate and construction support business - Involved in infrastructure development and project support related to construction, leveraging a comprehensive construction system as a strength Additionally, many qualified professionals, such as electrical chief engineers and construction management engineers, are on staff, providing strong support for companies in their decarbonization efforts and cost reduction with high technical skills and reliable responsiveness. In the solar power-related business and real estate-related business, we can provide a wide range of support from project sourcing and investigation stages to execution stages such as EPC, tailored to your needs.













