Industrial self-consumption solar power accelerates labor-saving at construction sites.

Simultaneously achieve reduced electricity costs and decreased workload. Start efficiency improvement and decarbonization management on-site with rooftop solar installations.

**Challenges on Site and Solutions from Solar Power** - Challenges in the Construction Industry Chronic labor shortages make site management difficult Rising fuel and electricity costs pressure profits Stronger demands for decarbonization and energy conservation - Solutions Provided by Solar Power Generation Reduction of dependence on external power sources through self-sufficiency in electricity on site Self-consumption of daytime electricity, reducing fuel usage Excellent compatibility with environmentally friendly construction methods, enhancing corporate value

Related Link - https://staging.ked-industrial-power.com/

basic information

**Why Solar Power is Optimal** - Reliable and Sustainable Cost Reduction After installation, it provides a stable supply of power on-site. Reduces the need for purchasing external electricity, simultaneously curbing costs and CO₂ emissions. - Zero Operational Burden No special personnel or on-site training is required after construction. Contributes to the simplification of site management. - Subsidies and Zero Initial Cost Plans Utilizes subsidies from the national and local governments. With the PPA model, it can be implemented without initial investment.

Price range

Delivery Time

Applications/Examples of results

【Case Study】 Saitama Prefecture Large Warehouse Construction Site Installed Capacity: 150kW Reduction Effect: Approximately 4.2 million yen in annual electricity costs CO₂ Reduction: Approximately 110 tons/year Comment: "Significant reduction in generator fuel costs due to self-sufficient power during the construction period. Combined with labor-saving methods, operational burdens are also reduced."

Related Videos

Introduction of a self-consumption solar power generation system.

TECHNICAL

[Achievements Introduction 2.0] Over 80 projects in the last 12 years with a total construction cost exceeding 900 billion yen! Solar power construction achievements!