ケー・エフ・シー Official site

AGF-Me (Metal eco) construction method

It is possible to separately collect steel pipes and injection materials during tunnel excavation! A construction method that allows for resource utilization as sorted industrial waste.

The "AGF-Me (Metal eco) method" is a patented method (Patent No. 3882118) for the non-widening long steel pipe advance construction. It features vertical slits in the end-reinforcing steel pipes of the cutting section during tunnel excavation with non-widening support, allowing for the separate recovery of the steel pipes and injected materials during excavation. This method eliminates unnecessary mixed industrial waste and enables resource utilization as sorted industrial waste. [Features] - Patent No. 3882118 obtained - Structure allows for the separate recovery of steel pipes and injected materials during excavation - Eliminates unnecessary mixed industrial waste and enables resource utilization as sorted industrial waste *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.kfc-net.co.jp/products/cat02/02/01/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

AGF-Me (Metal eco) construction method

PRODUCT

Long Steel Pipe Cutting Wing Reinforcement System 'Me Method / Me-fix'

PRODUCT

Distributors

Recommended products