松村組 本社 Official site

Seismic reinforcement pile construction under bridge girders | SPACE21 method

"Seismic reinforcement of bridges in Shizuoka" has overcome challenges related to restrictions in the upper space and the transportation of materials to the excavation bottom. The use of ultra-compact machinery for multi-joint construction has helped reduce temporary facility costs.

This is a case study of the construction of foundation piles for seismic reinforcement work on the Hanishigawa Bridge of National Route 1. In response to the challenging site conditions of a low headroom environment under the bridge girder and the narrow construction base for excavation down to the footing bottom while constructing reinforced earth walls, the "SPACE21 method" was introduced. ■ Space-saving: The compact machine, measuring a maximum of 2.8×2.2×2.0m, can be easily transported to the excavation bottom surrounded by reinforced earth walls. ■ Cost reduction: The leaderless design eliminates headroom loss, enabling the construction of 8 to 18 short, multiple connections under the girder. ■ Improved construction efficiency: Self-propelled movement allows for the rapid installation of 10 foundation piles even in limited spaces. ■ Wide adaptability: The method reliably accommodates heavy steel pipe piles with a diameter of 800mm and a length of 34.5m, as specified for this project. ■ Proven track record: In infrastructure development commissioned by the Chubu Regional Development Bureau, a safe and reliable bearing capacity was established. *For more details, please download the materials or feel free to contact us.

Related Link - https://www.matsumura-gumi.co.jp/technology/kiso_j…

basic information

For more details, please download the materials or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the materials or feel free to contact us.

SPACE21 Design and Construction Manual

MANUAL

Hydraulic Full Rotation Prefabricated Pile Boring Method "SPACE21 Method"

PRODUCT

Application examples of the 'SPACE21 method' for the construction of prefabricated piles under conditions such as low space and narrow locations.

TECHNICAL

Distributors

Matsumura Corporation is a general contractor under Prime Life Technologies, Inc., which was established through the business integration of Panasonic and Toyota Motor Corporation in the housing and construction sector. With the motto of "Changing the Norms of Construction," we aim for future-oriented urban development. We engage in a wide range of business activities, including contracting construction work, planning, design, supervision, and construction consulting services. We will continue to strive for further technical refinement, quality improvement, and enhanced after-sales service, working company-wide to meet the increasingly diverse and sophisticated needs of our customers. For any construction planning inquiries, please feel free to consult with us. Prime Life Technologies, Inc. was established in January 2020 as a company aiming for future-oriented urban development through the "fusion of lifestyle and technology." *Subsidiaries of Prime Life Technologies, Inc. include: Panasonic Homes, Toyota Home, Misawa Homes, Panasonic Construction Engineering, and Matsumura Corporation.

Recommended products