松村組 本社 Official site

Foundation pile construction for junction widening | SPACE21 method

"Road widening at Misato Junction" was carried out on a simple platform to reduce the impact on buried objects. More than 360 cases of safely driving long piles, up to 59.5 meters in length and multiple splices, were completed.

This is a case study of foundation pile construction associated with road widening at the ramp bridge construction of the Misato Junction on the Tokyo Gaikan Expressway. In an environment where reducing the impact on underground installations is required, and with the construction challenges posed by limited space on a temporary platform after excavation, the "SPACE21 method" was introduced. ■ Space-saving: Due to the lightweight and compact specialized machine, it operates safely even on temporary platforms where large heavy machinery cannot access. ■ Cost reduction: The all-rotation middle excavation method minimizes impact on the surrounding area, thereby reducing the costs of temporary protective measures. ■ Improved construction efficiency: The self-propelled moving unit enables quick and precise movements on the platform, supporting the process of mass pouring with up to 368 piles. ■ Wide adaptability: It reliably accommodates long piles with φ800mm and a maximum length of 59.5m (4 to 18 joints), and φ1000mm with a maximum length of 51.0m (4 to 16 joints). ■ Proven track record: Completed high-quality foundation construction with consideration for the surrounding environment at a key point in highway infrastructure. *For more details, please download the materials or feel free to contact us.

Related Link - https://www.matsumura-gumi.co.jp/technology/kiso_j…

basic information

For more details, please download the materials or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the materials or feel free to contact us.

SPACE21 Design and Construction Manual

MANUAL

Hydraulic Full Rotation Prefabricated Pile Boring Method "SPACE21 Method"

PRODUCT

Application examples of the 'SPACE21 method' for the construction of prefabricated piles under conditions such as low space and narrow locations.

TECHNICAL

Distributors

Matsumura Corporation is a general contractor under Prime Life Technologies, Inc., which was established through the business integration of Panasonic and Toyota Motor Corporation in the housing and construction sector. With the motto of "Changing the Norms of Construction," we aim for future-oriented urban development. We engage in a wide range of business activities, including contracting construction work, planning, design, supervision, and construction consulting services. We will continue to strive for further technical refinement, quality improvement, and enhanced after-sales service, working company-wide to meet the increasingly diverse and sophisticated needs of our customers. For any construction planning inquiries, please feel free to consult with us. Prime Life Technologies, Inc. was established in January 2020 as a company aiming for future-oriented urban development through the "fusion of lifestyle and technology." *Subsidiaries of Prime Life Technologies, Inc. include: Panasonic Homes, Toyota Home, Misawa Homes, Panasonic Construction Engineering, and Matsumura Corporation.

Recommended products