エムシーエム 北陸センター Official site

[Presenting Construction Case Studies] TDR Shot Lightning System

Corresponds to various sharp curves! Secondary lining construction system for shield steel segment sections.

We would like to introduce a case study of the "TDR Shot Lightning System." This method can easily accommodate special shapes and structures. It can fill every corner of the steel segments, achieving high density. In the sewer pipe and machine remnants (underground joints) of the second Toyama trunk line construction, it was applied with a finished inner diameter of 2400mm and a total length of 20m. 【Features of the Method】 ■ Accommodates various sharp curves ■ Easily adapts to special shapes and structures ■ Materials can be selected according to the tunnel's purpose ■ Fast construction speed ■ Easy maintenance ■ Excellent economic efficiency and shortened construction period *For more details, please refer to the PDF materials or feel free to contact us.

Related Link - https://www.mcmcm.jp/service/tdr-shot/

basic information

【Construction Overview (Excerpt)】 <Construction Name: Furukawa Underground Retention Basin Water Intake Facility Construction> ■Purpose of the Target Structure: Rainwater Storage Pipe Facility ■Construction Period: August to October 2014 ■Air Supply Pipe: Finished Inner Diameter / φ2200mm, Total Length of TDR Shot Method Construction / 19.5m <Construction Name: Reconstruction Work Near Nishi-Ochiai 2-Chome, Shinjuku Ward (Mejiro Shield)> ■Finished Inner Diameter: φ2400mm ■Total Length of TDR Shot Method Construction: 194m ■Construction Period: November 2015 to February 2016 *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Construction Example] TDR Shot Lightning System

TECHNICAL

Secondary lining construction system "TDR Shot Lining System"

PRODUCT

News about this product(1)

Distributors

Recommended products