エムシーエム 北陸センター Official site

TDR shot lining system method (mortar wet spraying method)

Corresponds to various sharp curves! A construction method for clients who want to reduce costs or shorten construction time.

The "TDR Shot Lining System Method" is a secondary lining construction system for shield steel segment sections. It responds to needs such as "wanting to fill steel segments in shield tunnels with sharp curves," "wanting to shorten construction time," and "wanting to increase construction speed." By introducing this method, it can accommodate sharp curve sections that are difficult to construct with conventional methods, and it can fill various areas of steel segments, achieving high density. 【Benefits of Implementation】 ■ Achieved approximately 1.7 times construction progress - T Construction Co. ■ Able to handle sharp curve sections that are difficult to construct with conventional methods ■ Can fill various areas of steel segments, resulting in high density *For more details, please refer to the related links or feel free to contact us.

Related Link - https://www.mcmcm.jp/service/tdr-shot/

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

【Purpose】 ■ Mortar spraying filling and finishing in secondary lining ■ For construction sites that want to reduce costs compared to other methods or shorten the construction period *For more details, please refer to the related links or feel free to contact us.

[Construction Example] TDR Shot Lightning System

TECHNICAL

Secondary lining construction system "TDR Shot Lining System"

PRODUCT

News about this product(1)

Distributors

Recommended products