High Cement Content Soil Improvement Agent MT Series [Construction Case] Pole Erection Work
This is an example of improving the soil during the construction of pole installation, enabling rapid pole installation work!
We would like to introduce examples of the MT series high-water-content soil stabilizer. During pile driving work, mud containing groundwater is generated during excavation, which has been a hindrance to construction. Therefore, the high-water-content soil stabilizer MT-1, which can be improved with a low additive amount and instantly, and is also safe for the environment, was adopted. After improving the sludge with this product, repeated re-excavation and mud removal with an auger were carried out, enabling rapid pile driving operations. It is currently being used at similar sites nationwide. *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Features of this product】 ● Instantly solidifies mud, allowing for immediate removal by dump trucks ● Can be improved with a low additive amount of approximately 1-8 kg/m3 ● This product is neutral and meets all soil environmental standards, making it safe ● Applicable to various types of mud, including cement-containing mud and harbor dredged soil ● Can be constructed using only a backhoe and a pit ● This product contains components that improve detachment from metals, reducing adhesion to backhoes and dump trucks, thus enhancing workability ● Packaged in poly bags, significantly reducing waste after use ● Can be improved without generating heat, unlike lime treatment ● This product has been treated to suppress dust generation, making it usable even in windy conditions ● If stored indoors, it can be used without issues even after about one year ● Registered product with the Ministry of Land, Infrastructure, Transport and Tourism (NETIS TH-160012-VE) 【Applicable Soil Types】 ● Dredged soil generated from harbor and river construction ● Bottom mud generated from pond renovation work ● Cement-containing sludge generated from ground improvement work ● Excess bentonite slurry generated from shield tunneling work ● Disaster-generated soil from heavy rain disasters, etc. ● Water purification soil generated from sun-dried beds at water treatment plants, among others
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.