High Cement Content Soil Improvement Agent MT Series [Construction Case] Adjustment Pond Dredging Work
Perfectly suited for the retention basin located in a residential area! A case where dredging was adopted for a retention basin with a narrow construction range.
This construction project involves the removal of sediment accumulated in the retention basin. The site is located near residential areas, and due to the limited construction space, it was difficult to use cement or lime for improvement. Therefore, a high-water-content soil improvement agent, MT-1, was adopted, and after improvement with this product, the material was immediately transported by dump truck to a nearby temporary storage area. *For more details, please refer to the PDF document or feel free to contact us.*
basic information
【Project Overview】 ■Construction Period: January 2023 ■Adopted Product: High Water Content Soil Stabilizer MT-1 ■After Improvement: Immediate transportation to nearby temporary storage site
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(6)
Download All Catalogs


