無支保工
無支保工
無支保工での作業を実現するプレキャスト(PC)部材
1~13 item / All 13 items
-

Precast component "Canopy PC" *Streamlining work at the canopy tip!
Precast components that streamline the labor-intensive work at the tip of eaves, which requires complex and advanced construction techniques!
last updated
-

Kaiser Balcony Method (Steel Structure)
We will streamline the work at the tip of the balcony, which requires difficult and advanced construction techniques!
last updated
-
Kaiserslautern method (steel structure)
Ensure a safe site environment! Half precast slabs with trusses serve as structural materials and formwork.
last updated
-
Parapet PC (Steel Structure)
Shortening the working hours on the top floor and achieving quality stabilization. We also propose methods for integration with the structure.
last updated
-
Waist wall PC
Challenging various types of precast exterior materials! Proposing solutions by leveraging technology.
last updated
-

Protruding slab PC at the tip *Compatible with the installation of fastener hardware, etc.
Full precast of the cantilever slab at the tip between the curtain wall and the beam! A construction method that excels in hard-to-work areas! Contributes to cost reduction and shortened construction time.
last updated
-

Slab for Kaiser Railway Viaduct Compatible with cast-in-place beams
It is possible to carry out construction directly above live wires, and it is compatible with cast-in-place beams.
last updated
-

Kaiser Railway Viaduct Slab
Strongly, quickly. It enables construction directly above live wires.
last updated
-

Kaiser railway slab shield tunnel floor slab
Lightweight construction using half precast results in a sense of unity in the finished product, as approximately half of the slab section is cast on-site, and it also contributes to the reduction of formwork.
last updated
-
Precast Beam Compatible Slab for Kaiser Railway Viaduct
It is possible to work directly above live lines and is compatible with precast beams.
last updated
-

Kaiser BARD floor slab Floor slab inside the shield tunnel
The use of half precast for weight reduction, with about half of the mid-floor slab section being cast on-site, results in a sense of unity in the finished product and further contributes to the reduction of temporary supports.
last updated
-

Half precast top plate
The use of half precast for weight reduction, with about half of the top section being cast on-site, results in a sense of unity in the finished product and also contributes to the reduction of formwork.
last updated
-

Kaiser BARD floor panel
It achieves labor-saving and rational construction, along with excellent fatigue durability.
last updated