ペリー・ジャパン Official site

  • COMPANY

[Homepage (Project)] Updated the progress of the construction site (Tōkai Bridge) with photos as of the end of November!

ペリー・ジャパン

ペリー・ジャパン

On our company website, we introduce construction sites in Japan and other locations. Recently, from November 28 to December 1, 2023, we conducted a photo shoot at the construction site of the Danjiang Bridge in Tamsui District, New Taipei City, Taiwan. The main tower of this project will reach a height of 200 meters above the water surface. According to the plan, the main tower will be constructed in 53 floors, with each floor having a complex shape. As of now, the construction of up to the 17th floor has been completed. Please check our company website (Projects) for more details. ■ Project Name: "Danjiang Bridge Project" If completed, the Danjiang Bridge, designed by the late Zaha Hadid, will be the longest single-tower, asymmetrical cable-stayed bridge in the world. The construction of this RC main tower utilizes the Perry System (SCS+VARIO). Additionally, this project is an all-Perry project that was awarded with the support of the Perry Group's project and technical teams, with Perry Japan as the point of contact.

PERI LOGO
DB Project U17

Related Links

PERI Japan Co., Ltd.
PERI Japan Co., Ltd. was established in January 2006 as one of the locations of PERI (headquartered in Germany) in over 60 countries worldwide. We are working to solve various challenges faced by our customers, such as improving safety and quality, reducing labor and construction time, and cutting costs, by providing formwork and shoring systems that address these issues in various situations, including concrete pouring at construction sites.

Related catalog

Company Profile: Perry Japan Co., Ltd.

COMPANY

PERI BOOK 2023 International - EN

COMPANY