ペリー・ジャパン Official site

  • COMPANY

The homepage (project) has been updated with additional photos of the construction site (Tōkai Bridge) as of the end of November 2023.

ペリー・ジャパン

ペリー・ジャパン

We have added site photos from the construction of the Danjiang Bridge, which is being carried out in Tamsui District, New Taipei City, Taiwan, from November 28 to December 1, 2023, to our company website (Projects). The main tower will reach a height of 200 meters above the water surface. According to the plan, the main tower will be constructed in 53 floors, with each floor having a complex shape. As of the end of November 2023, the construction of up to the 17th floor has been completed. Please check our company website (Projects) for more details. ■ Project Name: "Danjiang Bridge Project" If completed, the Danjiang Bridge, designed by the late Zaha Hadid, will be the longest single-tower, asymmetrical cable-stayed bridge in the world. The construction of this reinforced concrete main tower utilizes the Perry System (SCS+VARIO). Additionally, this project is an all-Perry project that was awarded with the support of the Perry Group's project and technical teams, with Perry Japan as the point of contact. Perry Japan Co., Ltd.

Related Links

PERI Japan Co., Ltd.
PERI Japan Co., Ltd. was established in January 2006 as one of the locations of PERI (headquartered in Germany) in over 60 countries worldwide. We are engaged in providing formwork and shoring systems to solve various challenges faced by our customers, such as improving safety and quality, labor-saving, shortening construction periods, and reducing costs, in various situations including concrete pouring at construction sites.

Related catalog

Company Profile: Perry Japan Co., Ltd.

COMPANY

PERI BOOK 2023 International - EN

COMPANY