Formwork scaffolding / Perimeter panel climbing system 'PERI RCS'
Construction kit system for various projects requiring self-elevating technology.
The "PERI RCS Rail Climbing System" is a climbing system that serves as a formwork-integrated scaffold and self-climbing protection panel. There are two methods of climbing: one using a crane and the other using a movable hydraulic device instead of a crane, allowing for selection based on the construction requirements. Additionally, the climbing formwork-integrated scaffold comes standard with a carriage equipped with push-pull support. 【Product Features】 ■ Safe rail-guided procedure - The moving unit is always connected to the building by climbing shoes. ■ Flexible installation - Climbing shoes can be attached to walls and slab edges. ■ Variable assembly - The arrangement of 125mm holes in the climbing rail allows the platform to be adjusted to the height of each floor. *For more details, please refer to the PDF materials or feel free to contact us.
basic information
【Product Advantages】 ■ Improved efficiency in formwork operations ■ Significant reduction in workforce ■ Assurance of accuracy in formwork construction ■ Reduction of scaffolding materials 【Advantages of PERI RCS Hydraulic Cylinder】 ■ The climbing rail serves a guiding function during ascent, but the rail itself does not rise in advance; it is part of the load-bearing system. ■ The climbing rail can easily pass through openings in walls. ■ The movable hydraulic jacks can be reconfigured at any time, proving to be cost-effective for mid- to high-rise buildings. *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Model number/Brand name
PERI RCS (Rail Climbing System)
Applications/Examples of results
For a concrete image of climbing, please refer to the related videos. At Perry Japan, we hold events at the Ibaraki stockyard based on the concept of "Listen, See, Touch/Ride, Assemble" to learn. We conduct product exhibition tours of system formwork, study sessions on system formwork, assembly experiences, and product seminars according to our customers' requests. *For more details, please refer to the PDF materials or feel free to contact us.
Related Videos
catalog(3)
Download All CatalogsNews about this product(8)
-
【Product News】PERI climbing systems 'SCS', 'RCS', 'ACS', and 'CB' are used at construction sites around the world.
The PERI climbing systems 'SCS', 'RCS', 'ACS', and 'CB' are utilized at various construction sites. The climbing systems, which are one of PERI's product groups, are used at construction sites around the world. These systems integrate working scaffolding and formwork systems to achieve 'improved formwork work efficiency', 'significant reduction in workforce', 'ensured accuracy in formwork construction', 'reduction of scaffolding materials', and 'safety in the work area'. There are two types of climbing methods: one that uses cranes and another that uses a movable hydraulic device instead of a crane, allowing for the selection of the optimal method based on the construction content. **For more details, please check the related products. We also hold 'product assembly experiences' and 'system formwork study sessions' at our stockyard, so please feel free to contact us.** PERI Japan Co., Ltd.
-
PERI products are used on construction sites around the world. (Denmark: Lighthouse 2.0)
PERI products are used on construction sites around the world. This time, we would like to introduce the construction site 'Lighthouse 2.0' in Aarhus, Denmark. Lighthouse 2.0 is a mixed-use project that includes the high-rise building "Arhus Φ," which is 44 stories tall (142m) and constructed in Aarhus, Denmark. "Arhus Φ" has become the tallest residential building constructed in Denmark. It is located within a 2 km radius of the Aarhus Cathedral in the city center, boasting an excellent location overlooking Aarhus Bay. It was also selected as the best building in the category of Best Tall Building 100–199 Meters at the 2023 CTBUH Awards. PERI products were used in the construction of this building. PERI products: 1. ACS Climbing System 2. PERI UP 3. RCS-P (RCS External Climbing), among others *For more details, please refer to the PDF document or feel free to contact us.
-
PERI products are used at construction sites around the world. (Bangkok, Thailand: KingBridge Tower)
PERI products are used on construction sites around the world. This time, we would like to introduce the construction site of 'KingBridge Tower' in Bangkok, Thailand. This project is located at the intersection of the Phra Pinklao Bridge over the Chao Phraya River and Rama III Road in Bangkok, Thailand. It is a 52-story high-rise building with a total floor area of over 80,000 square meters, constructed by the local subsidiary of the major Japanese general contractor Obayashi Corporation (Thai Obayashi). PERI products were used in the construction of this massive high-rise building. PERI products: 1. VARIO GT24 Wall Formwork * Used in combination with a climbing system for the pouring of the lift core. 2. DUO System Formwork * Used for the pouring of various concrete walls. 3. RCS Rail Climbing System * Used for the construction of circular columns and lift cores. From PERI Thailand (Representative): PERI Thailand is proud to have contributed to the success of this project.
-
【Product News】PERI climbing systems 'RCS', 'ACS', and 'CB' are used at construction sites around the world.
The PERI climbing systems 'RCS', 'ACS', and 'CB' are utilized at various construction sites. The climbing systems, which are one of PERI's product groups, are used at construction sites around the world. This integrated climbing system combines working scaffolding and formwork systems to achieve 'improved formwork work efficiency', 'significant reduction in workforce', 'ensured accuracy in formwork construction', 'reduction of scaffolding materials', and 'ensured safety in the work area'. There are two types of climbing methods: one that uses a crane and another that uses a movable hydraulic device instead of a crane, allowing for the selection of the optimal method based on the specifics of the construction project. **For more details, please check the related products. We also hold 'product assembly experiences' and 'study sessions on system formwork' at our stockyard, so please feel free to contact us. PERI Japan Co., Ltd.
-
【Product News】PERI climbing systems 'RCS', 'ACS', and 'CB' are used at construction sites around the world.
The PERI climbing systems 'RCS', 'ACS', and 'CB' are utilized at various construction sites. The climbing systems, which are one of PERI's product groups, are used at construction sites around the world. This integrated climbing system combines working scaffolding and formwork systems to achieve 'improved formwork work efficiency', 'significant reduction in workforce', 'ensured accuracy in formwork construction', 'reduction of scaffolding materials', and 'ensured safety in the work area'. There are two types of climbing methods: one using a crane and the other using a movable hydraulic device instead of a crane, allowing for the selection of the optimal method based on the construction content. **For more details, please check the related products. We also hold 'product assembly experiences' and 'system formwork study sessions' at our stockyard, so please feel free to contact us. PERI Japan Co., Ltd.