Large scaffolding/formwork automatic climbing system 'PERI ACS'
Construction kit system for various works requiring self-elevating technology.
The "PERI ACS Automatic Climbing System" is an integrated climbing system that serves as a self-climbing working scaffold and a large formwork panel system. 【Product Features】 ■ It is possible to climb with an integrated system of working scaffold and large formwork. ■ It uses hydraulic cylinders (rising 4 to 6 meters in about 20 minutes per batch). ■ Climbing is possible on both the outer side and the hollow of bridge piers. ■ Formwork can be safely and easily constructed and stripped on the main stage. ■ By placing the formwork on a carriage that can move back and forth on the stage, construction and stripping work for each concrete pouring batch can be performed safely and efficiently. *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Product Benefits】 ■ Improved formwork work efficiency ■ Significant reduction in workforce ■ Ensured accuracy in formwork construction ■ Reduction of scaffolding materials *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Model number/Brand name
PERI ACS (Auto Climbing System)
Applications/Examples of results
At Perry Japan, we hold tours of our Ibaraki stockyard based on the concept of "Listen, See, Touch/Ride, Assemble" to meet our customers' needs. We conduct product exhibitions of system formwork, study sessions on system formwork, assembly experiences, and product seminars. *For more details, please refer to the PDF materials or feel free to contact us.
Related Videos
catalog(3)
Download All CatalogsNews about this product(11)
-
The homepage (project) has been updated with additional photos of the construction site (Tōkai Bridge) as of mid-August 2025.
We have added site photos of the Danjiang Bridge, currently under construction in Tamsui District, New Taipei City, Taiwan (taken on August 19, 2025), to our company website (Projects). The main tower will reach a height of 200 meters above the water surface. According to the plan, the main tower will be constructed in 53 floors, with each floor featuring a complex variation in shape. As of the end of August 2025, the construction of up to the 52nd floor has been completed. The construction of the main tower has now entered its final stage. Please check our company website (Projects) for more information. ■ Project Name: "Danjiang Bridge Project" If completed, the Danjiang Bridge, designed by the late Zaha Hadid, will be the longest single-tower, asymmetrical cable-stayed bridge in the world. The construction of this reinforced concrete main tower utilizes the Perry System (SCS+VARIO and ACS+VARIO). Additionally, this project has been awarded as an all-Perry project, receiving support from the Perry Group's project and technical teams through Perry Japan as the point of contact. Perry Japan Co., Ltd.
-
【Product News】PERI climbing systems 'SCS', 'RCS', 'ACS', and 'CB' are used at construction sites around the world.
The PERI climbing systems 'SCS', 'RCS', 'ACS', and 'CB' are utilized at various construction sites. The climbing systems, which are one of PERI's product groups, are used at construction sites around the world. These systems integrate working scaffolding and formwork systems to achieve 'improved formwork work efficiency', 'significant reduction in workforce', 'ensured accuracy in formwork construction', 'reduction of scaffolding materials', and 'safety in the work area'. There are two types of climbing methods: one that uses cranes and another that uses a movable hydraulic device instead of a crane, allowing for the selection of the optimal method based on the construction content. **For more details, please check the related products. We also hold 'product assembly experiences' and 'system formwork study sessions' at our stockyard, so please feel free to contact us.** PERI Japan Co., Ltd.
-
The overseas site inspection article of the "Tamsui Bridge" in Taiwan will be published in the February 2025 issue of "Bridges and Foundations"!
The article about the overseas site inspection of the "Tamsui River Bridge" will be published in the February 2025 issue of "Bridges and Foundations"! "Bridges and Foundations" is a specialized magazine on bridge technology published by Construction Library Co., Ltd. In late October 2024, a site inspection of the "Tamsui River Bridge" was conducted by the editorial committee of "Bridges and Foundations." The "Tamsui River Bridge" is being constructed at the estuary of the Tamsui River, which separates Tamsui District and Bali District in New Taipei City, Taiwan, facing the Taiwan Strait. Once completed, it will have the longest span in the world for a single-tower, asymmetrical cable-stayed bridge. The design plan was created by the late Zaha Hadid, a world-renowned architect, who designed the single-tower, asymmetrical cable-stayed bridge. PERI's climbing systems (SCS) and (ACS) are being used in the construction of the main tower of this "Tamsui River Bridge," which will also become a historical heritage for Taiwan. **The February 2025 issue of "Bridges and Foundations" will be released on February 6, 2025. We hope you will consider purchasing it. For information on the February 2025 issue of "Bridges and Foundations" and back issues, please refer to the related links for Construction Library Co., Ltd. and Shinano Book.com.↓↓
-
PERI products are used on construction sites around the world. (Denmark: Lighthouse 2.0)
PERI products are used on construction sites around the world. This time, we would like to introduce the construction site 'Lighthouse 2.0' in Aarhus, Denmark. Lighthouse 2.0 is a mixed-use project that includes the high-rise building "Arhus Φ," which is 44 stories tall (142m) and constructed in Aarhus, Denmark. "Arhus Φ" has become the tallest residential building constructed in Denmark. It is located within a 2 km radius of the Aarhus Cathedral in the city center, boasting an excellent location overlooking Aarhus Bay. It was also selected as the best building in the category of Best Tall Building 100–199 Meters at the 2023 CTBUH Awards. PERI products were used in the construction of this building. PERI products: 1. ACS Climbing System 2. PERI UP 3. RCS-P (RCS External Climbing), among others *For more details, please refer to the PDF document or feel free to contact us.
-
PERI products are used at construction sites around the world. (Taiwan, New Taipei City (Tamsui District): Tamkang Bridge)
PERI products are used at construction sites around the world. This time, we will introduce the construction site of the "Tamsui Bridge" in Tamsui District, Taipei, Taiwan. The Tamsui Bridge is a bridge currently under construction over the Tamsui River, which separates the Tamsui District and Bali District of New Taipei City, Taiwan. The total length of the bridge is 920 meters, with the main tower reaching a height of 200 meters. The plan is to pour concrete for the main tower in 53 lifts, with the shape of the main tower changing complexly for each lift. PERI products are being used in the construction of this main tower. PERI products: 1. SCS Climbing System * Used for lifts 2 to 29 and 50 to 53. 2. ACS Self-Climbing System * Used for lifts 30 to 49. 3. PERI GT24 Girder * A formwork beam material with high load-bearing capacity and rigidity. 4. VARIO GT24 Wall Formwork * A truss beam wall formwork system using adjustable slots and joint fittings. 5. Custom formwork.