<Minister of Land, Infrastructure, Transport and Tourism Certified Material> Pile Head Joint Method "Joint Coupler Method"
Reduction in the number of pile head connection bars is possible! A pile head connection method with significant load-bearing capacity: "Joint Coupler Method."
- It is possible to enhance the strength of the pile head joint and reduce the number of reinforcement bars at the pile head joint. - It can minimize interference with the reinforcement of the superstructure. - The anchorage length of the fixed anchor can be shortened. The performance has been verified through full-scale experiments, and the construction method has received evaluation from the Japan Architectural Center (a public interest incorporated foundation), while the materials have been certified by the Minister of Land, Infrastructure, Transport and Tourism. Copies of the evaluation report from the Japan Architectural Center and the certification from the Minister of Land, Infrastructure, Transport and Tourism can be downloaded from the Senkushia website. *For more details, please download the PDF materials or feel free to contact us.
basic information
1) Due to the effects of the D41 high-strength large-diameter anchoring anchor and joint coupler, it is possible to secure a large load capacity, making it suitable for use with high-strength piles. 2) If the same load capacity as conventional methods is sufficient, the number of anchoring anchors can be reduced, thereby minimizing interference with the reinforcing bars of the superstructure. 3) By providing an anchoring body at the upper end of the anchoring anchor, high anchoring performance is ensured. 4) This allows for a shorter anchoring length compared to conventional methods (the method of welding deformed bars to pile steel pipes). For example, in the conventional method with D38 and an anchoring length of 40d, the anchoring length is 1520mm, while in the joint coupler method with D41, it is 780mm. *The joint coupler method is a product developed jointly by Japan Pile Co., Ltd. and Senkushia Co., Ltd.
Price range
Delivery Time
Applications/Examples of results
Purpose: Building foundation work Achievements: Adopted for the foundation work of a business hotel.