If you are struggling with seismic reinforcement of steel structures, contact Senkushia for total support.
From on-site surveys to seismic assessments and reinforcement work, we provide consistent support. With our original construction methods, we propose safe and reliable seismic reinforcement in a short construction period.
Are your factory and warehouse earthquake measures in place? Do you have any of the following concerns? - I want to conduct a seismic assessment, but I don't know who to ask. - I am considering BCP measures. - I want to take effective measures without incurring too much cost. - I don't want to stop operations due to reinforcement work. At Senkushia, we provide consistent support from on-site surveys, seismic assessments, seismic reinforcement design to seismic reinforcement construction. Utilizing the technology and know-how we have developed so far, we propose safe and secure seismic reinforcements while continuing the operations of factories and warehouses. 【Senkushia's Original "Steel Frame Seismic Reinforcement System"】 <Smart Attach Method> As a non-welding method, it eliminates the need for fire protection work at the construction site, shortens the construction period, and reduces total costs. <Smart Fit Method> Compared to conventional methods, the height dimensions of the reinforcement materials are smaller, allowing for compact reinforcement and minimizing interference with production lines. <Smart Chronos II Method> By eliminating welding, it reduces fire risks and contributes to total cost reduction through shortened construction periods. *For more details on other features, please refer to the PDF materials or feel free to contact us.
basic information
【Other Features】 <Smart Fit Method> This method involves installing reinforcement columns and anchor bolts outside existing steel columns and connecting the columns to improve the bending resistance, shear resistance, and ductility index (F value) of the column bases. The "RC Root Wrapping Reinforcement Method" is not required. It is a new method that offers a short construction period and low cost. <Smart Attach Method> This is a no-welding joint method developed with the concept of "no welding" and "improved construction efficiency" on-site. With the use of dedicated SA hardware, it allows for the installation of brace materials using only high-strength bolts. <Smart Chronos II Method> This is a no-welding vertical brace joint method developed with the concept of "no welding," "improved construction efficiency," and "shortened construction period" on-site. *For more details, please refer to the PDF materials or feel free to contact us. *We also accept inquiries regarding seismic diagnosis.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All Catalogs