Smart Chronos II Method
Level adjustment of the joining hardware is possible! Work in narrow areas on the exterior wall can also be done easily.
The "Smart Chronos II Method" is a no-welding vertical brace connection method developed with the concepts of "no welding," "improved construction efficiency," and "shortened construction period" in mind. The selection of applicable brace sizes is easy due to the existing column sizes and the positions of the connection points. Since welding work on-site is unnecessary, it reduces the risk of fire. Additionally, the connecting beams ensure the connection's load-bearing capacity and reduce shear stress at the column base. It has obtained the construction technology review certification from the Japan Building Center. 【Features】 ■ Reduced fire risk through no welding ■ Shortened construction period ■ Reduced total costs ■ Simplified design process ■ Obtained construction technology review certification (BCJ) *For more details, please refer to the PDF materials or feel free to contact us.
basic information
**Merits** - Reduces fire risk as on-site welding work is unnecessary. - Easy selection of applicable brace sizes due to existing column sizes and joint positions. - Ensures joint strength and reduces shear stress at the column base through connecting beams. - No need for paint stripping or stiffener reinforcement of existing columns due to dedicated connection hardware. - Level adjustment of connection hardware is possible (in the vertical direction (hardware installation position) and horizontal direction (GPL eccentricity)). - Work in narrow areas on the outer wall is easily feasible (no need for outer wall removal and restoration). - Obtained construction technology review certification from the Japan Building Center (BCJ-Review Certification-308). *For more details, please refer to the PDF materials or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.