[ZEROSAI Case Study] Road Improvement Project Monitoring Precipitation Observation and Forecasting
Install a camera at the top of the slope to monitor the site! A case study of implementation in improvement work.
【Case Study】 ■Purpose - The ground is unstable, and the slope height is 10 meters, so rain measures are essential. - The site office is 10 minutes away by car, making camera monitoring and instructions necessary. - We want to monitor the camera and precipitation observations and forecasts to issue work stoppage orders. ■Effects - Due to the difficulty of securing power, operating the camera with solar energy is very innovative. - A camera was installed at the top of the slope to monitor the entire site. - Alerts could be issued immediately in conjunction with precipitation forecasts. - The day after rain, the site conditions were checked via camera, allowing for rescheduling of holidays. *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Introduction of Equipment】 ■N Sensor ■Camera ■Solar Power Supply *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(9)
Download All Catalogs






