Technical proposal utilization plan: Wind resistance measures for bridge superstructure and substructure construction.
Technical proposal utilization plan: Wind resistance measures for bridge superstructure and substructure construction.
The natural disaster prevention system ZEROSAI (Zero Sai) NETIS registration number QS-150021-VE can be utilized not only for safety measures related to weather at construction sites but also for technical proposals. In bridge construction, it is crucial to understand wind speed and rainfall forecasts when performing crane operations to prevent the scattering of crane materials and equipment. We will introduce case studies of implementation at sites where "strong wind countermeasures" are the theme of technical proposals. *For more details, please visit our website or feel free to contact us.*
basic information
For more details, please visit our website or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
Ministry of Land, Infrastructure, Transport and Tourism - Prefectures - Ordered Construction Technical Proposals - Creativity and Innovation On-site Safety Measures - Visualization via Cloud
catalog(7)
Download All Catalogs



