Technical Proposal Utilization Plan for the Main Construction of the 〇〇 Dam - Rainfall Countermeasures
Utilization plan for technical proposals: Rainfall measures in dam construction.
■On-site Issues: Focus Points in Evaluation (Example) Proposals for construction methods that consider the surrounding environment ■Proposal (Example) Utilizing the 【Natural Disaster Prevention System ZEROSAI】 to manage pinpoint weather forecasts for 17 days ahead at a 500m mesh on-site, along with continuous cloud-based management of weather observation data and information on warnings and advisories issued by the Meteorological Agency. Installing 【N Sensors】 on-site to utilize observation data to improve the accuracy of heat index (WBGT) and wind speed predictions. Additionally, using 【Disaster Prevention Lights】 and 【Three-color Display Lights】 to continuously display weather information and provide phased alerts to workers. *For more details, please visit our website or feel free to contact us.
basic information
For more details, please visit our website or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
Ministry of Land, Infrastructure, Transport and Tourism, Prefectures, Ministry of Defense Technical Proposal, Creativity and Ingenuity
catalog(8)
Download All Catalogs




