Underground Obstacle Removal Method

Underground Obstacle Removal Method
We are implementing the "Hiro Work kmighty method," which involves the complete removal of existing foundation piles, as well as the "Bauer method" and "Super Top method" for excavating and removing obstacles. The "Bauer method" is used when the depth is shallow or when construction is close to narrow spaces or structures. The "Super Top method" is applied in cases of deep depths or hard ground.
1~3 item / All 3 items
-
HiroWork Kmighty Method
NETIS registration! The "full-length extraction method" pulls out existing piles with ultra-low vibration and ultra-low noise.
last updated
-
Bauer method
Excavation of underground obstacles and all-casing foundation pile work can be carried out close to the boundaries even in sites where buildings and structures are densely packed!
last updated
-
For deep excavation work and cutting/removal of underground obstacles! Super Top Method.
The construction of place-driven piles in ground with boulders or bedrock, as well as deep excavation work, demonstrates its effectiveness in cutting and removing underground obstacles.