A low headroom sliding method using an all-casing (full rotary) construction technique that allows work up to a headroom limit of 4.4 meters. For place-driven piles in ground with boulders or bedrock, construction is carried out using the super top method.
1~2 item / All 2 items
-
Low-altitude slide construction method
It is a full casing (full rotary) method that enables work up to a depth of 4.4 meters.
last updated
-
For deep excavation work and cutting/removal of underground obstacles! Super Top Method.
The construction of place-driven piles in ground with boulders or bedrock, as well as deep excavation work, demonstrates its effectiveness in cutting and removing underground obstacles.