Three S Method
Three S Method
I will introduce the Three S method.
1~5 item / All 5 items
-
Tunnel Leakage Control Work and Line Drainage Work [B4] Construction Procedure
Introducing the construction procedure for the tunnel water leakage prevention method "Three S Method" using elastic materials.
last updated
-
Repair and reinforcement method: "Carbon Fiber Sheet Repair and Fall Prevention Work"
Introduction to Towa Industries' Repair and Reinforcement Methods: Carbon Fiber Sheet Repair and Fall Prevention Work.
last updated
-
[Construction Example] Three S Method
Introducing examples of the Three S method construction carried out in areas with cold water leaks!
last updated
-
Tunnel leakage prevention work and line drainage work [B4] "Three S Method"
Introducing the tunnel water leakage prevention method "Three S Method" using elastic materials.
last updated
-
Toho Sangyo Co., Ltd. Business Introduction
For all kinds of waterproofing, corrosion prevention, and structural repairs and reinforcements, leave it to us!
last updated