[Construction Example] Bridges over Railways and Main Roads (2) Rapid Installation of Full Suspended Scaffolding
Sending out using rails! An example of a rack scaffolding method that can achieve a full suspension scaffold state.
The "Rack Scaffolding (R)" is a movable suspended scaffolding that uses two rack rails installed on a structure as its track. After installing the movable floor of the rack scaffolding, only the extension work of the rack rails, which serve as the track, is required, allowing for a significant reduction in the construction period for scaffolding work. It demonstrates its characteristics at various sites, and in situations where "there is a need to quickly install a full suspended scaffolding on bridges over railways or main roads," the movable floor of the rack scaffolding can be assembled outside the influence area of the railway or main road, enabling the sequential deployment of the movable floor within a limited time to achieve a full suspended scaffolding state. [Rack Scaffolding (R) Features] ■ High safety ■ Quick installation possible ■ Excellent cost-effectiveness ■ Material-saving potential ■ Compatible with various shapes of structures *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Case Summary】 ■Specific Example on Site: Bridges on Railways and Main Roads (2) Sites where it is necessary to quickly set up full suspended scaffolding ■Effects - Assemble rack scaffolding movable floors outside the influence range of railways and main roads, and by sequentially sending out the rack scaffolding movable floors within the limited time of track power shutdown, it is possible to achieve a full suspended scaffolding state. - Use of rack scaffolding not as a "movable suspended scaffolding method," but as a method to "quickly construct full suspended scaffolding by sending out scaffolding using rails." *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Construction Achievements】 ■ Second Keihan National Route Exclusive Section (Ministry of Land, Infrastructure, Transport and Tourism) ■ Isogo Elevated Bridge (Ministry of Land, Infrastructure, Transport and Tourism) *For more details, please refer to the PDF document or feel free to contact us.