Rack scaffolding (R) business

Rack scaffolding (R) business
We handle everything from the design of our unique technology, the "Rack Scaffolding" (a horizontally movable suspended scaffolding using two rack rails), to manufacturing, construction planning, strength assessment documentation, and on-site handling instructions. We have numerous construction achievements from the Ministry of Land, Infrastructure, Transport and Tourism and Japan Expressway Company, covering large buildings such as airports and factories.
1~30 item / All 65 items
-
Mobile scaffold "Rack Scaffolding (R)"
No additional scaffolding assembly is required. A significant reduction in construction time is possible.
last updated
-
[Construction Case] A site where a shorter construction period is required compared to conventional methods.
Examples of site-specific rack scaffolding methods that allow for resource-saving! There is no need for time-consuming movement (rearrangement) of the scaffolding.
last updated
-
[Construction Example] Rapidly installing scaffolding at night when the factory is not in operation.
High safety and rapid construction possible! Examples of rack scaffolding methods with minimal work on factory equipment.
last updated
-
[Construction Example] A site that requires rapid response to changes in the level of the work surface.
Level changes can be made with just a change in the hanging material length! Specific examples of sites where the characteristics of the rack scaffolding method can be demonstrated.
last updated
-
[Construction Case] Bridges over Railways and Main Roads (1) Shortening of Construction Period for Scaffold Installation
It is possible to minimize the risk of damage due to scaffold falls! Examples of rack scaffold construction methods.
last updated
-
[Construction Example] Bridges over Railways and Main Roads (2) Rapid Installation of Full Suspended Scaffolding
Sending out using rails! An example of a rack scaffolding method that can achieve a full suspension scaffold state.
last updated
-
[Construction Case] Bridge Inspection
It is possible to quickly set up and dismantle scaffolding! A concrete example of a site where the characteristics of the rack scaffolding method can be demonstrated.
last updated
-
【Construction Example】A site where the movement of rack scaffolding can be utilized for material transportation.
Materials that are difficult to transport manually with conventional scaffolding can be easily transported! Examples of rack scaffolding construction methods.
last updated
-
[Construction Examples] Installation of Falling Prevention Sheets and Installation of Falling Prevention Nets
Introducing specific examples of high-efficiency rack scaffolding methods on site! Excellent economic efficiency and the possibility of material reduction.
last updated
-
【Construction Case】A site where it is necessary to reduce traffic regulations on the main road under the bridge.
Utilized as a fall prevention facility! Introducing case studies of rack scaffolding methods that can reduce traffic restrictions.
last updated
-
[Construction Case] A site where transporting a large amount of suspended scaffolding materials is difficult.
Possible resource-saving! Specific examples of sites where the characteristics of the rack rail-type movable scaffolding method can be demonstrated.
last updated
-
【Construction Example】Bridges on Shipping Routes
A rack scaffolding method that minimizes the impact on navigating vessels! Here are some specific examples from the field.
last updated
-
[Construction Example] A site where the rack scaffolding is being rearranged over the bridge pier to the next span (1)
With materials for one span, it is possible to install scaffolding for multi-span bridges! Introducing examples of the rack scaffolding method.
last updated
-
[Construction Case] A site where the rack scaffolding is being changed over to the next span beyond the bridge pier (2)
A rack scaffolding method that allows for the installation of scaffolding on multi-span bridges using materials for a single span! Here are some specific examples from the field.
last updated
-
[Construction Case] Inspection of External Work Vehicles
A specific example of a site where the characteristics of the rack scaffolding method can be demonstrated! It can be installed even with a small load capacity of the work vehicle.
last updated
-
【Scaffolding Construction Achievements】Iwaki Bridge
Thank you for using it for the bolt tightening, painting of the main girder connection section, and the tensioning work of the diagonal members!
last updated
-
[Scaffold Construction Achievements] Tamagawa Sky Bridge
Construction of the new Tamagawa Sky Bridge! High-strength bolt work at the main girder connection and on-site painting work were utilized!
last updated
-
【Scaffolding Construction Achievements】Wakato Bridge
Utilize for the regular inspection of the stiffening girders of the simple truss section, side span section, and central span section on the Wakamatsu side of the Wakatō Bridge spanning Donghai Bay!
last updated
-
[Rack Scaffolding Construction Achievements] Tajiri Sky Bridge
The maximum spacing between the left and right rails has been expanded from 24m to 29m! It is now possible to accommodate wide bridges!
last updated
-
【Scaffold Construction Achievements】 Shimono Ohashi
Under the site conditions where there are significant changes in height, you have adopted "rack scaffolding"!
last updated
-
[Scaffolding Construction Achievements] Yahata Bridge
Under the site conditions where there are significant changes in the height of the girders on the JR Hanawa Line, you have adopted "rack scaffolding"!
last updated
-
[Scaffold Construction Achievements] Ariake Chikugo River Bridge
The upper structure construction of the Ariake Chikugo River Bridge, which spans the Chikugo River on National Route 208 along the Ariake Sea coastal road, has been utilized!
last updated
-
【Scaffold Construction Achievements】 Hayashi Overpass and 4 other bridges
Although there were many intersections at the site, you were able to use it safely until the end of the project!
last updated
-
【Scaffolding Construction Achievements】 Hamana Bridge
Solving maintenance management issues! We utilized "rack scaffolding" for bridge inspections and repair work!
last updated
-
[Scaffolding Construction Achievements] Okaya Overpass
"Rack scaffolding" allows for efficient scaffolding installation work even during limited working hours when the tracks are closed!
last updated
-
【Scaffolding Construction Achievements】Omorihashi Bridge
No lane restrictions or barges were needed at all! There was almost no impact on road users!
last updated
-
[Scaffolding Construction Achievements] Kotohira Ohashi Bridge
We installed the "rack scaffolding" without using any post-installed anchors at all!
last updated
-
[Scaffolding Construction Achievements] Tokyo Gaikan Expressway Takashu Viaduct
By having the "rack scaffolding" cover below in advance, we were able to eliminate the need for traffic regulations on the national road!
last updated
-
【Scaffolding Construction Achievements】Kan-Etsu Expressway Katashina River Bridge
We also utilized it as a mobile protective equipment, contributing to even safer work!
last updated
-
[Scaffolding Construction Achievements] Isogo Elevated Bridge
The installation period for the suspended scaffolding on the municipal road can now be limited to just two nights of nighttime work!
last updated