米山工業 Official site

[Scaffolding Construction Achievements] Yahata Bridge

Under the site conditions where there are significant changes in the height of the girders on the JR Hanawa Line, you have adopted "rack scaffolding"!

We would like to introduce our construction achievements for the concrete spalling prevention measures at the Yahata Bridge (a prestressed concrete three-span continuous frame box girder bridge) that crosses the JR Hanawa Line on the Tohoku Expressway. Given the site conditions where there is a significant change in girder height over the JR Hanawa Line, we adopted the "rack scaffolding." Please feel free to contact us if you have any inquiries. 【Overview】 ■ Location/Prefecture: Akita Prefecture ■ Client: East Japan Railway Company Morioka Branch ■ Construction Company: Senken Kogyo Co., Ltd. ■ Start of Use: May 2019 (up line), April 2020 (down line) ■ Experience of local workers in rack scaffolding construction: Yes ■ Availability of dispatched instructors for rack scaffolding handling: Yes *For more details, please refer to the PDF materials or feel free to contact us.

Related Link - http://www.yonekou.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Related Videos

Rack Scaffolding Performance Table

OTHER

Rack Scaffolding Explanation Materials <Construction Version>

TECHNICAL

Rack Scaffolding Explanation Materials <Civil Engineering Version>

TECHNICAL

"Rack Rail Type Mobile Scaffolding Method" - Effective On-Site Examples (with Photos) & Frequently Asked Questions Collection

TECHNICAL

Distributors

Recommended products