米山工業 Official site

[Scaffolding Construction Achievements] Tokyo Gaikan Expressway Takashu Viaduct

By having the "rack scaffolding" cover below in advance, we were able to eliminate the need for traffic regulations on the national road!

We would like to introduce our construction achievements for the new installation of the Takashu Viaduct (a steel 5-span continuous 2-main mixed girder bridge, and a steel 5-span continuous 2-main plate girder bridge) on the Tokyo Gaikan Expressway. To reduce the necessary traffic regulations on the national road during the installation of the full suspended scaffold, we adopted the "rack scaffold." By covering the area below the full suspended scaffold installation in advance, we were able to eliminate the need for traffic regulations on the national road. 【Overview】 ■ Location/Prefecture: Saitama Prefecture ■ Client: NEXCO East Japan ■ Construction Company: Tokyo Steel Bridge Co., Ltd. and Katayama Structec Co., Ltd. Joint Venture ■ Start of Use: January 2015 ■ Local Workers' Experience with Rack Scaffold Installation: First time ■ Dispatch of Rack Scaffold Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.yonekou.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Related Videos

Rack Scaffolding Performance Table

OTHER

Rack Scaffolding Explanation Materials <Construction Version>

TECHNICAL

Rack Scaffolding Explanation Materials <Civil Engineering Version>

TECHNICAL

"Rack Rail Type Mobile Scaffolding Method" - Effective On-Site Examples (with Photos) & Frequently Asked Questions Collection

TECHNICAL

Distributors

Recommended products