[Scaffold Construction Achievements] Ariake Chikugo River Bridge
The upper structure construction of the Ariake Chikugo River Bridge, which spans the Chikugo River on National Route 208 along the Ariake Sea coastal road, has been utilized!
We would like to introduce our construction achievements using "rack scaffolding." This was utilized for the superstructure work of the Ariake Chikugo River Bridge (a steel four-span continuous <two-span> single-cable arch bridge) over the Chikugo River along National Route 208 on the Ariake Sea coast (for dismantling the suspended scaffolding and as a substitute for the suspended scaffolding). Please feel free to contact us when you need our services. 【Overview】 ■ Location/Prefecture: Fukuoka Prefecture ■ Client: Kyushu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism ■ Construction Company: MMB, Miyachi, Kawada Joint Venture ■ Start Date of Use: July 2018 ■ Local Workers' Experience with Rack Scaffolding: First time ■ Availability of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.