[Scaffolding Construction Achievements] Isogo Elevated Bridge
The installation period for the suspended scaffolding on the municipal road can now be limited to just two nights of nighttime work!
We would like to introduce our construction achievements for the new construction work of the Isogo Elevated Bridge (Part 1) in the "Negishi Area" along National Route 357 (Wangan Road). The Isogo Elevated Bridge spans Yokohama City Road No. 181, and to shorten the period for the installation of the suspended scaffolding on this city road, we adopted the "rack scaffolding." At the construction yard beside the city road, we assembled and lifted a scaffolding that can cover the entire width of the city road (19m in the width direction × 24m in the bridge axis direction), which was later transported onto the city road during nighttime work. As a result of this adoption, the period for the installation of the suspended scaffolding on the city road was reduced to just two nights of nighttime work. This site was adopted not as a "mobile suspended scaffolding method," but as a method that "quickly constructs full suspended scaffolding by using rails to extend the scaffolding." *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Overview】 ■Location/Prefecture: Kanagawa Prefecture ■Client: Ministry of Land, Infrastructure, Transport and Tourism, Kanto Regional Development Bureau ■Construction Company: Kawada Industries, Ltd. ■Start Date of Use: June 2013 ■Experience of Local Workers in Rack Scaffolding Construction: Yes ■Availability of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.