Rack scaffolding construction results: Kushikawa Bridge
We have adopted the construction of support scaffolding and the use of horizontal PC steel materials as scaffolding during the installation of the horizontal beams!
We would like to introduce our construction achievements for the Kushikawa Bridge (PC three-span continuous box girder bridge) located between Sagamihara I.C. and Takaozan I.C. on the Ken-O Expressway. This bridge consists of two box girders between A1 and P2, and three box girders between P2 and A2 after the ramp merge, and it is a PC box girder bridge with intermediate cross girders between the box girders. The "rack scaffolding" was adopted as the support structure during the construction of the cross girders and as the scaffolding for the PC steel materials for the cross girders. Despite being a large-scale and highly challenging bridge with a width variation of 4m (27.5m to 31.5m) and a girder height variation of 5m (4m to 9.5m), we were able to assist with the scaffolding installation under the meticulous planning and appropriate instructions from the construction company. *For more details, please refer to the PDF document or feel free to contact us.*
basic information
【Overview】 ■Location/Prefecture: Kanagawa Prefecture ■Client: Kanto Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism ■Construction Company: Kawada Construction Co., Ltd. ■Start Date of Use: June 2013 ■Experience of On-site Workers in Rack Scaffolding Construction: First time ■Presence of Rack Scaffolding Handling Instructor: Yes *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.