[Scaffold Construction Achievements] Minato Bridge
By utilizing the characteristic of being able to move horizontally, it has become possible to minimize the impact on navigating vessels!
We would like to introduce our track record of repair and reinforcement work on the port bridge (2-span simple pre-tensioned PCT girder bridge). Since the intersecting property is a shipping route, we adopted a "rack scaffold" that allows the movable floor to be shifted outside the shipping route when not in operation. By utilizing the characteristic of lateral movement, we were able to minimize the impact on navigating vessels. Additionally, the bridge surface included an R-shaped batten section, which we were also able to use without any issues by taking advantage of its characteristics. [Overview] ■ Location/Prefecture: Fukuoka Prefecture ■ Client: Kitakyushu City ■ Construction Company: Toyo Construction Co., Ltd. ■ Start Date of Use: November 2011 ■ Experience of local workers with rack scaffold installation: First time ■ Availability of rack scaffold handling instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.