[Scaffold Construction Achievements] Kawada Industrial Co., Ltd. Factory Gantry Crane

It was completed in just two days over the weekend! There was no impact on the operation of the gantry crane at all!

We would like to introduce our track record of painting and repainting work on a gantry crane (approximately 35m high). Since the gantry crane operates on weekdays, the painting work was scheduled to take place only on weekends. We adopted "rack scaffolding" as it allowed us to move within a range that would not interfere with the crane's operation. The installation and removal work was completed in just two days over the weekend, so there was no impact on the operation of the gantry crane. [Overview] ■ Location/Prefecture: Kagawa Prefecture ■ Client: Kawada Industries, Inc. ■ Contractor: Kawada Industries, Inc. ■ Start of Use: March 2010 ■ Local workers' experience with rack scaffolding: First time ■ Availability of rack scaffolding handling instructor: Yes *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.yonekou.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Related Videos

Rack Scaffolding Performance Table

OTHER

Rack Scaffolding Explanation Materials <Construction Version>

TECHNICAL

Rack Scaffolding Explanation Materials <Civil Engineering Version>

TECHNICAL

"Rack Rail Type Mobile Scaffolding Method" - Effective On-Site Examples (with Photos) & Frequently Asked Questions Collection

TECHNICAL

Distributors

Recommended products