[Scaffolding Construction Achievements] Takizawa River Bridge
Replace the 'rack scaffolding' with the target span! Adopt a method to cross the bridge pier without lowering the moving floor to the ground!
We would like to introduce our track record in floor slab repair work. Due to the difficulty of moving the floor and lifting it under the target span, we installed a "rack scaffold" in the adjacent span. Subsequently, we adopted a method to raise the floor without lowering it to the ground, allowing us to cross over the bridge pier. This site maximized the unique characteristic of being able to cross over the bridge pier without lowering the scaffold to the ground. 【Overview】 ■ Location/Prefecture: Kanagawa Prefecture ■ Client: NEXCO Central Japan ■ Contractor: Kajima Corporation ■ Start of Use: September 2009 to October 2009 ■ Experience of local workers with rack scaffold installation: First time ■ Availability of rack scaffold handling instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.