[Scaffolding Construction Achievements] New Chitose Airport
It is possible to minimize the impact on ground operations! We were able to install it without any issues by utilizing its characteristics.
We would like to introduce our construction achievements related to the ceiling finishing work for the new international passenger terminal building at New Chitose Airport. Since the installation rail components (large roof truss) are curved in a planar manner, the track width has changed. However, by utilizing the characteristics of the "rack scaffolding," we were able to install it without any issues. Additionally, during the lateral reconfiguration, the movable floor was never lowered to the ground, which minimized the impact on ground operations. 【Overview】 ■ Location/Prefecture: Hokkaido ■ Client: Hokkaido Airport Co., Ltd. ■ Construction Company: Kajima, Miyasaka, Arai Joint Venture ■ Start of Use: August 2009 ■ Local Workers' Experience with Rack Scaffolding: First time ■ Dispatch of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.