米山工業 Official site

[Scaffolding Construction Achievements] New Chitose Airport

It is possible to minimize the impact on ground operations! We were able to install it without any issues by utilizing its characteristics.

We would like to introduce our construction achievements related to the ceiling finishing work for the new international passenger terminal building at New Chitose Airport. Since the installation rail components (large roof truss) are curved in a planar manner, the track width has changed. However, by utilizing the characteristics of the "rack scaffolding," we were able to install it without any issues. Additionally, during the lateral reconfiguration, the movable floor was never lowered to the ground, which minimized the impact on ground operations. 【Overview】 ■ Location/Prefecture: Hokkaido ■ Client: Hokkaido Airport Co., Ltd. ■ Construction Company: Kajima, Miyasaka, Arai Joint Venture ■ Start of Use: August 2009 ■ Local Workers' Experience with Rack Scaffolding: First time ■ Dispatch of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.yonekou.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Related Videos

Rack Scaffolding Performance Table

OTHER

Rack Scaffolding Explanation Materials <Construction Version>

TECHNICAL

Rack Scaffolding Explanation Materials <Civil Engineering Version>

TECHNICAL

"Rack Rail Type Mobile Scaffolding Method" - Effective On-Site Examples (with Photos) & Frequently Asked Questions Collection

TECHNICAL

Distributors

Recommended products