[Scaffolding Construction Achievements] Singapore Changi International Airport
Using "rack scaffolding" for ceiling panel renovation! The scaffolding has also been moved due to the rearrangement.
We would like to introduce our construction achievements regarding the ceiling panel finishing during the renovation work of Terminal 1. Since the renovation work is being carried out while the airport is in operation, the construction area is within temporary enclosures. To efficiently conduct the renovation work in the limited space within the enclosures, a method was adopted to simultaneously carry out the ceiling panel renovation and floor renovation. During this ceiling panel renovation, "rack scaffolding" was utilized. The scaffolding was also moved in accordance with the changes to the temporary enclosures. [Overview] ■ Location/Prefecture: Singapore ■ Client: CAG (Changi Airport Group) ■ Construction Company: Takenaka Corporation ■ Start Date of Use: May 2009 ■ Local workers' experience with rack scaffolding: First time ■ Presence of rack scaffolding handling instructor: Yes *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.