[Scaffold Construction Achievements] Nata Overpass
By equipping the movable bed with a lift, we have accommodated a change in beam height of 3.0m!
We would like to introduce our construction achievements in the repair work of PC box girder bridges (including concrete painting and crack injection, etc.). This is a cross bridge that spans National Route 2, and to shorten the scaffolding work process on the national road, we utilized "rack scaffolding." By using brackets to suspend the rails from the ground cover, we were able to install them without driving concrete anchors into the upper structure. Additionally, by equipping the movable floor with a lift, we accommodated a height variation of 3.0 meters in the girder. 【Overview】 ■ Location/Prefecture: Okayama Prefecture ■ Client: Ministry of Land, Infrastructure, Transport and Tourism ■ Construction Company: Light Industry Co., Ltd. ■ Start of Use: September 2008 ■ Local Workers' Experience with Rack Scaffolding: Extensive experience ■ Availability of Rack Scaffolding Instruction Personnel: Yes *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.