[Scaffold Construction Achievements] Nata Overpass

By equipping the movable bed with a lift, we have accommodated a change in beam height of 3.0m!

We would like to introduce our construction achievements in the repair work of PC box girder bridges (including concrete painting and crack injection, etc.). This is a cross bridge that spans National Route 2, and to shorten the scaffolding work process on the national road, we utilized "rack scaffolding." By using brackets to suspend the rails from the ground cover, we were able to install them without driving concrete anchors into the upper structure. Additionally, by equipping the movable floor with a lift, we accommodated a height variation of 3.0 meters in the girder. 【Overview】 ■ Location/Prefecture: Okayama Prefecture ■ Client: Ministry of Land, Infrastructure, Transport and Tourism ■ Construction Company: Light Industry Co., Ltd. ■ Start of Use: September 2008 ■ Local Workers' Experience with Rack Scaffolding: Extensive experience ■ Availability of Rack Scaffolding Instruction Personnel: Yes *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.yonekou.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Related Videos

Rack Scaffolding Performance Table

OTHER

Rack Scaffolding Explanation Materials <Construction Version>

TECHNICAL

Rack Scaffolding Explanation Materials <Civil Engineering Version>

TECHNICAL

"Rack Rail Type Mobile Scaffolding Method" - Effective On-Site Examples (with Photos) & Frequently Asked Questions Collection

TECHNICAL

Distributors

Recommended products