米山工業 Official site

[Scaffolding Construction Achievements] Akashi Kaikyō Bridge Exterior Work Vehicle

The exterior work vehicle for the Tatarabashi Bridge also used the lightweight "rack scaffolding" made with resource-saving materials!

We would like to introduce our construction achievements regarding the inspection of the exterior work vehicles for the Akashi Kaikyō Bridge. Due to the small load capacity of the work vehicles and the difficulty in installing suspended scaffolding, we installed a lightweight "rack scaffolding" using fewer materials. Additionally, this was similarly utilized for the exterior work vehicles of the Tarada Bridge. 【Overview】 ■ Location/Prefecture: Hyogo Prefecture ■ Client: Honshu-Shikoku Bridge Authority (currently Honshu-Shikoku Bridge Expressway Company) ■ Start date of use: July 2004 (initial) ■ Experience of local workers in rack scaffolding installation: First time ■ Dispatch of rack scaffolding handling instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.yonekou.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Related Videos

Rack Scaffolding Performance Table

OTHER

Rack Scaffolding Explanation Materials <Construction Version>

TECHNICAL

Rack Scaffolding Explanation Materials <Civil Engineering Version>

TECHNICAL

"Rack Rail Type Mobile Scaffolding Method" - Effective On-Site Examples (with Photos) & Frequently Asked Questions Collection

TECHNICAL

Distributors

Recommended products