[Scaffolding Construction Achievements] Matsuyama Airport
It is possible to finish all ceiling panels! Introducing our construction achievements at airports.
During the renovation work at Matsuyama Airport, "rack scaffolding" was utilized for the finishing of the ceiling panels. First, the ceiling panels, except for the rail suspension points, were finished in advance, and finally, the finishing of the ceiling panels at the rail suspension points was completed during the removal of the rails. By doing this, it became possible to finish all ceiling panels using our product. [Overview] ■ Location/Prefecture: Ehime Prefecture ■ Client: Ehime Prefecture ■ Construction Company: Okumura Corporation ■ Start Date of Use: August 1994 ■ Local Workers' Experience with Rack Scaffolding: First time ■ Presence of Rack Scaffolding Handling Instructor: Yes *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.