米山工業 Official site

【Scaffold Construction Achievements】Shuto Expressway No. 7 Komatsugawa Line

The permanent scaffolding installation work was utilized on the Metropolitan Expressway No. 7 Komatsugawa Line.

We would like to introduce our construction achievements on the Metropolitan Expressway. In a section from the Ryogoku Junction to the Kinshicho Toll Plaza on the Metropolitan Expressway Route 7 Komatsugawa Line, we utilized permanent scaffolding installation work. Due to the minimal interference between the permanent scaffolding and the rack scaffolding suspension points, we were able to carry out the permanent scaffolding installation work efficiently. 【Overview】 ■ Location: Tokyo ■ Client: Metropolitan Expressway Company Limited ■ Construction Company: JFE ShoBond (Repair) Upper Structure Reinforcement 2-210 Special Construction Joint Venture ■ Start Date of Use: June 2023 to May 2024 ■ Local Workers' Experience with Rack Scaffolding Installation: First time ■ Dispatch of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.yonekou.jp/rack

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Related Videos

"Rack Rail Type Mobile Scaffolding Method" - Effective On-Site Examples (with Photos) & Frequently Asked Questions Collection

TECHNICAL

Rack Scaffolding Explanation Materials <Civil Engineering Version>

TECHNICAL

Rack Scaffolding Explanation Materials <Construction Version>

TECHNICAL

Rack Scaffolding Performance Table

OTHER

Distributors

Recommended products