Features of the TNF method (1)
Introducing the features of our TNF method, which has reduced costs by approximately 30% compared to traditional pile foundations!
We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 achievements nationwide. In soft ground across the country, we perform ground improvement to create an artificial bedrock suitable for the building. Compared to conventional methods (pile foundations), we can achieve approximately 30% cost reduction (for a total floor area of 1,000 m² and pile length of 30 m). Please feel free to contact us when you need our services. 【Features】 - Compared to conventional methods, there is no need for pile work, formwork work, or ground preparation work, resulting in a 50% reduction in construction time (for a total floor area of 1,000 m² and pile length of 30 m). - Since no piles are used, the demolition costs during building dismantling are also reduced. *For more details, please refer to the related links or feel free to contact us.
basic information
【Recommended for】 ■ Design offices ■ General contractors ■ Companies needing commercial stores or logistics warehouses ■ Clients planning factories, warehouses, or stores on weak ground requiring pile foundations *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■Alternative to pile foundations in construction *For more details, please refer to the related links or feel free to contact us.
Related Videos
catalog(1)
Download All CatalogsNews about this product(4)
-

The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
-

It was broadcast on NHK WORLD.
The Noto reconstruction project by the Kashima, Yoshimitsu, and Noto region maintenance-type construction joint venture was featured on NHK WORLD, stating that it is being constructed using a 3D printer, and it was broadcast on November 14. It can be viewed in 150 countries around the world.
-

We held a site tour.
At the site of the "R6 Komatsu Yobama Construction," we held a site tour for four days starting from November 24. Visitors were able to observe the automation and remote operation of construction machinery. The event was also featured in the Construction Industry Newspaper and the Construction Communication Newspaper.
-

It was awarded as an excellent construction project by Nomi City.
On November 21, at the Nomi City Hall, our company was awarded for the "Yuno Children's Garden Development Project (Civil Engineering)" as an excellent construction project at the Nomi City Construction Project Awards Ceremony. For more details, please refer to the related link.
Distributors
We have been in the construction business for over 100 years, based in Ishikawa Prefecture.

















