ヒロセ補強土 Official site

Collection of Common Case Resolutions After Construction Order Placement

Resolving Common "Unexpected" Cases Before and After Construction Orders - Ground Improvement and Structural Reinforcement Edition -

Are you facing any of the following issues? ■ Unable to improve the ground due to gravel and boulders ■ Ground improvement at a site where machinery access is difficult ■ Discovery of different ground layers than those identified in the ground survey ■ Unable to improve due to the depth of rock layers, slope of the ground, soil type, etc. 【Table of Contents】 ■ Case 1: Revealed by boring survey results ■ Case 2: Occurred during the delivery of construction machinery ■ Case 3: Discovery of different ground layers than those identified in geological surveys ■ Case 4: Reinforced earth wall does not meet the expected good ground conditions during design ■ Case 5: Site is too narrow for improvement ■ Case 6: Ground is found to be harder than expected ■ Case 7: Temporary road requires avoiding buried objects *For more details, please download the PDF or feel free to contact us.

Related Link - https://hirosehokyodo.actibookone.com/content/deta…

basic information

Recommended for the following individuals: ■General Contractors *For more details, please download the PDF or feel free to contact us.*

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

Collection of Common Case Resolutions After Construction Order Placement

TECHNICAL

Distributors

Reinforced soil refers to the technology used to build soil vertically high or to prevent collapse when soil is excavated. It is an essential technology in Japan, which is narrow and prone to earthquakes. Hirose Reinforced Soil Co., Ltd. also engages in civil engineering consulting using these methods.

Recommended products