Railway and track maintenance

Railway and track maintenance
In railway and track maintenance work, we contribute to the digital transformation of maintenance operations by obtaining the "gauge," "alignment," "level," and "elevation" of the left and right rails in absolute coordinates simply by running along the track, and by calculating the advance amount of special switches using surveying equipment. Track inspection / Calculation of advance amount for special switches / Digital recording of obstacle data corresponding to kilometer information / Monitoring the impact on the track due to nearby construction.
1~5 item / All 5 items
-
Track Displacement Automatic Monitoring System [Track Station 3]
Monitoring the displacement of the track and the entire surrounding area due to the effects of nearby construction.
last updated
-
Special Switch Point Inspection System [Track Station F]
DX in track maintenance business / Quality control through ICT Achieving solo work and time reduction
last updated
-
MTT Obstacle Detection System [Truck Station M]
DX of maintenance work / Quality control through ICT, improving work efficiency and preventing mistakes.
last updated
-
Real-time Orbit Monitoring System【Rikimus】
DX in track maintenance business / Quality control through ICT, improving work efficiency and preventing mistakes.
last updated
-
Semi-Automatic Track Displacement Measurement System [Track Station 2]
Monitor track displacement semi-automatically without entering the track area.
last updated