計測ネットサービス Official site

Semi-Automatic Track Displacement Measurement System [Track Station 2]

Monitor track displacement semi-automatically without entering the track area.

In March 2024, we registered with NETIS. KT-230145-A (3D Displacement Automatic Measurement Cloud Management System) This system safely and efficiently monitors the regular displacement status of tracks using an automatic total station. After the installation of the prism, it is generally unnecessary to enter the track, and the track measurement is conducted semi-automatically.

Semi-Automatic Track Displacement Measurement System [Track Station 2]

basic information

- No entry into the track! A reflective prism is installed at the measurement position on the rail in advance. After that, the measurement work can be carried out basically without entering the track. - Automatic observation after total station installation Once the surveying instrument is set up in the designated position, subsequent observations are conducted automatically. The surveyor can check the measurement results on the controller's screen on-site. - Screen interface and reports The data obtained by the measurement system can be output as "Completion Status Inspection Records" by connecting to a printer, thus reducing the effort required to prepare submission materials. Additionally, the displacement amounts for each measurement point can also be output in graph form. - Management items [Track gauge, level, process, alignment, flatness]

Price range

Delivery Time

Applications/Examples of results

Measuring railway track displacement.

Semi-Automatic Track Displacement Measurement System [Track Station 2]

PRODUCT

Distributors

Recommended products