Foundation and Ground

Foundation and Ground
In foundation and ground construction, we support pile driving management using 3D coordinate data and GNSS, as well as quality control for accurate positioning of pile drivers and safety management for monitoring the impact on nearby structures. Guidance to pile driving locations / Improvement of construction accuracy / Measurement of ground displacement / Radiometric surveying and position correction / Monitoring of noise and vibration levels during construction.
1~13 item / All 13 items
-
Pile Driving Management System [Pile Navi Cloud-P]
Operation support system for guiding heavy machinery to the design pile core coordinates.
last updated
-
Pile Driving Management System [Pile Navi Cloud-V]
Visually manage the position and tilt of the piles to achieve high-precision pile driving. It can also be viewed remotely via a web browser.
last updated
-
Piling Management System [Pile Navi Cloud-S]
Sheet Pile (Steel Sheet Pile) Installation Management System
last updated
-
3D Displacement Measurement System [DAMSYS]
Safe and reliable construction, unmanned labor-saving, 24-hour real-time observation.
last updated
-
Wireless Subsidence Sensor [Wimos]
Real-time automatic measurement of subsidence and uplift! Numerous achievements in various locations such as roads, ground, bridges, railways, and buildings.
last updated
-
3D Measurement System 【3D-Field】
For one-man surveying! Surveying is possible with intuitive operation through the integration of real and virtual.
last updated
-
3D Displacement Measurement System [Mobile Dam Sys]
Install only when necessary, and perform semi-automatic measurements over a wide area.
last updated
-
3D Surface Measurement System [DAMSYS-Hybrid]
Automatic measurement of the current state of slopes and landslides, as well as the condition of structures, using "points" and "surfaces." Achieving 24-hour automatic monitoring.
last updated
-
Hangzhou Ground Improvement Construction Information Visualization System 【3D Pile Viewer】
Ground improvement work using ICT: Visualizing, accumulating, and utilizing invisible construction information within the ground.
last updated
-
Construction Survey Guidance System [Survey Navigation 3D]
Inducing structures without braces.
last updated
-
Piling Management System [Pile Navi Cloud-W]
New arrival in March 2025! Measure inclined piles with a single total station.
last updated
-
Pile Driving Management System [Pile Navi Cloud-H]
Newly launched in May 2025! Measure H-shaped steel with a single total station.
last updated
-
[Case Study of Pile Navi H] Construction of Detour Road at Toroko Bridge, Shibecha Town
During the construction of the detour road for National Route 391 in Shibecha Town at the Torro Bridge, the vertical direction of the piles was checked during the installation of the temporary bridge.
last updated