Pile Driving Management System [Pile Navi Cloud-P]
Operation support system for guiding heavy machinery to the design pile core coordinates.
Using GNSS (GPS/GLONASS), we measure the position information of the pile center in real time and visually display the positional relationship to the designed pile center coordinates on an onboard monitor. This is a support system for operating cranes and three-point heavy machinery during pile driving construction in ground improvement, enhancing accuracy and work efficiency. It manages the locations for driving piles in precast pile installation and ground improvement work. NETIS Registration KT-220168-VE Patent: No. 6214282
basic information
Using GNSS (GPS/GLONASS), the position information of the pile center is measured in real-time, and the positional relationship to the designed pile center coordinates is visually displayed on an in-vehicle monitor. This is a support system for the operation of cranes and three-point heavy machinery during pile driving construction in ground improvement, enhancing accuracy and work efficiency. It manages the locations for driving piles in the installation of prefabricated piles and ground improvement work. ● System Features It displays whether the work has not yet been performed or has already been completed on the screen. Upon completion of measurements, completion information (such as the amount of deviation from the installation value) can be saved. Operators can perform heavy machinery operations while looking at the in-vehicle monitor, allowing for a visual grasp of the construction process. The actual measured values are visualized, enabling more reliable construction compared to traditional human guidance or estimation. ● Acquiring Pile Position Using GNSS The pile position is measured using GNSS, guiding to the pile driving construction position.
Price range
Delivery Time
Model number/Brand name
Hang Driving Management System Pile Navi Cloud-P
Applications/Examples of results
【Applications】 - Ground improvement work - Precast pile work (steel pipe piles, PC piles) - Cast-in-place work and various pile driving methods 【Examples of Achievements】 - Pile driving management associated with national road improvement work - Pile driving management associated with levee seismic reinforcement work - Pile driving management associated with port ground improvement work - Pile driving management associated with Takahashi bridge replacement work - Pile driving management associated with Ken-O Expressway substructure work