Airport

Airport
At the airport, the flatness of the runway is defined by strict standards. Various systems support the site, including measuring uplift and settlement with a rotating laser, guiding heavy machinery to the pile center using GNSS, and managing the accuracy of pile driving with a total station. Surface measurement with a scanner / management of pile driving during ground improvement / setting of prohibited areas for work within aviation restrictions.
1~7 item / All 7 items
-

Wireless Subsidence Sensor [Wimos]
Real-time automatic measurement of subsidence and uplift! Numerous achievements in various locations such as roads, ground, bridges, railways, and buildings.
last updated
-

3D scanning measurement system [3D Surface-B]
Difference in height with design | Flatness of the casting surface | Quality control of the finished product
last updated
-

Construction Field 3D Monitoring System [3D Barrier]
Improving safety during crane operations / Managing in a three-dimensional area to prevent intrusion into restricted zones and maintain distance from surroundings.
last updated
-

Pile Driving Management System [Pile Navi Cloud-V]
Visually manage the position and tilt of the piles to achieve high-precision pile driving. It can also be viewed remotely via a web browser.
last updated
-

Hangzhou Ground Improvement Construction Information Visualization System 【3D Pile Viewer】
Ground improvement work using ICT: Visualizing, accumulating, and utilizing invisible construction information within the ground.
last updated
-

[3D Barrier Implementation Case] Management of Separation Between Heavy Machinery and High Voltage Lines During Factory Construction
Management of the distance between heavy machinery and high-voltage lines during foundation work, steel frame construction, and the transportation of other materials associated with factory construction.
last updated
-

[3D Barrier Introduction Case Study] Safety Monitoring of Proximity Construction in PA Substructure Works
Monitoring of safety zones for adjacent construction work in the lower section of the parking area.
last updated