森環境技術研究所 Official site

  • CATALOG

[New Construction Case Study] Adjustment Pond Dredging Work

森環境技術研究所

森環境技術研究所

We have uploaded a new construction case using the high water content soil improvement agent MT series. This case involves the dredging work of a retention pond located in a residential area. Please take a look at the link below. This project involves the removal of mud and soil that has accumulated in the retention pond. The site is located near a residential area, and due to the limited construction space, it was difficult to use cement or lime for improvement. Therefore, the high water content soil improvement agent MT-1 was adopted, and after improvement with this product, the material was immediately transported to a nearby temporary storage area using a dump truck. *For more details, please refer to the PDF document or feel free to contact us.

Related Documents

Related catalog

High Cement Content Soil Improvement Agent MT Series [Construction Case] Adjustment Pond Dredging Work

TECHNICAL